GA Solar 3 – Tanglewood Solar

GA Solar 3 – Tanglewood Solar in Camilla, Mitchell County, Georgia

Client: Tanglewood Solar | September/October 2019

GA Solar 3 PROJECT SUMMARY:

  • Installation of 26,600 linear feet of 6’ High Chain Link Fence with 1’ of 3-Strand Barbwire.  The 2.5” diameter line posts were driven 3’ into the ground.  Chain link fabric was supported by top and bottom tension wire.  3” terminals and corners were braced, trussed, and set in concrete.
  • Installation of (4) 6’ + 1’ x 20’ Wide Chain Link Double-Drive Gates on 4” posts with concrete footers.
  • Installation of signage on the perimeter fence.
  • Fence work was substantially completed in 28 working days in September/October 2019.